Industrial manufacturing facility
Sector / 04 · Industrial Manufacturing

One ERP for your entire operation.

Job shop, make-to-order, make-to-stock, or engineer-to-order. Cortrova unifies safety, quality, production, maintenance, inventory, delivery, and finance with ISO 9001 and ISO 14001 native. For 10 to 500 employee manufacturers.

Standards ISO 9001 · 14001
Areas 7 unified
Headcount 10 to 500
Go-Live 4 to 8 weeks
Compliance

ISO 9001 and 14001.
Same structure. Different focus.

Both standards share the Annex SL high-level structure of clauses 4 through 10. Cortrova maps each clause to the platform once, then surfaces what each standard needs from that clause. One audit prep workflow covers both certifications.

Render 045 · ISO 9001 vs ISO 14001
/industrial/iso-comparison
Quality Mgmt ISO 9001:2015 QMS · product and service quality
vs
Environmental Mgmt ISO 14001:2015 EMS · environmental performance
// 9001 coverage Annex SL clause // 14001 coverage
Customer focus, stakeholder mapping, scope definition
Cl 4Context of Organization
Environmental aspects, compliance obligations, scope
Top-management commitment, customer-centric policy
Cl 5Leadership
Top-management commitment, environmental policy
Risk-based thinking, quality objectives, change planning
Cl 6Planning
Aspects and impacts, compliance obligations, env objectives
Resources, competence, awareness, document control
Cl 7Support
Resources, competence, communication, document control
Operational planning, customer requirements, product control
Cl 8Operation
Operational controls, emergency preparedness and response
Monitoring, measurement, internal audit, management review
Cl 9Performance Eval
Monitoring, evaluation of compliance, internal audit, mgmt review
Nonconformity, CAPA, continual improvement
Cl 10Improvement
Nonconformity, CAPA, continual environmental improvement
// 7 shared clauses · Annex SL structure One mapping. Two certifications. AI Mock Auditor for both //
Production Types

Four shop types. One platform.

Whatever your production model, the same Cortrova platform tunes to fit. Below, a decision matrix mapping the most common industrial production models to the modules each one leans on hardest. Filled circles mark the critical modules. Open circles mark supporting capabilities.

Render 046 · Production Type x Capability Matrix
/industrial/production-matrix
Production Type Quality
QMS
Production
Planning
Shop Floor
Control
Maintenance
CMMS
Safety
EHS
Inventory
Lots
Finance
Costing
Type / 01 Job Shop Custom one-offs · quote to ship
Type / 02 Make-to-Order Customer-specific build to order
Type / 03 Make-to-Stock Standard products to forecast
Type / 04 Engineer-to-Order Engineered project per order
// Critical module // Supporting module
// 4 production types · 7 modules Same platform · tuned per shop All modules included //
Plant Manager View

The single screen that runs your plant.

What your plant manager sees first thing in the morning. Live KPIs, the AI's overnight briefing, and the actions that need attention before the first shift starts. Built from data already flowing through Cortrova. No exports, no spreadsheets, no waiting.

Render 047 · Plant Manager Daily Brief
/dashboard/plant-manager
Good morning Plant Manager · Plant 01
06:14 AM · Wednesday, Mar 12
All systems live
// OEE 87.4% Overall Equipment Effectiveness +2.1 vs last week
// Quality 99.2% First Pass Yield +0.4 vs last week
// On-Time 94.8% On-Time Delivery -1.2 vs last week
// Safety 147 Days since recordable Goal: 365
Trunnion AI · Daily Brief Generated 06:00 AM

Two cross-domain patterns flagged overnight.

Line 03's Cpk on Operation 040 has drifted from 1.42 to 1.18 over the last 14 days. The Cross-Domain Analyzer correlates this drift with overdue PM WO-4471 on Press 03 and a supplier lot change from Vendor B on March 04. Both vectors compound. Recommended: pull the press for PM before second shift and quarantine the open Vendor B lot for re-inspection.

SPC drift PM overdue Supplier change Cross-domain
// Convergence Predictive Incident Engine 0 high-risk zones today
// Open Work Active work orders 23 open · 4 past-due
// CAPA Open corrective actions 7 open · 2 due this week
Action items 5 items · sorted by priority
Act Press 03 PM overdue 3 days. AI recommends pull before second shift to prevent Cpk drift downstream. 06:14
Warn Vendor B lot 4471 received yesterday. First parts under inspection. Hold downstream until release. 05:42
Warn OTD trending down 1.2 points. 3 orders flagged for early-warning review by Scheduler. 05:30
Info ISO 9001 surveillance audit in 28 days. Mock Auditor session scheduled for Friday at 10:00 AM. 04:00
Info Q1 ESG report draft ready. Emissions, waste, and water tracking pulled from ISO 14001 module. 03:18
// Live operational view 4 KPIs · 1 brief · 5 actions Refreshed every 15 minutes //
Get Started

See Cortrova running your operation.

The team will tailor the demo to your production type, your most painful module, and the ISO surveillance audit on your calendar. No generic walkthrough.

Other Sectors

Same platform.
Tuned per industry.

Each sector page surfaces the same Cortrova platform with the compliance frameworks and capabilities most relevant to that vertical.